Series Preface |
|
ix | |
Preface |
|
xi | |
Acknowledgments |
|
xv | |
|
|
xvii | |
I DESIGN, MODELING AND ANALYSIS |
|
|
The Group Technology Problem with Bottleneck Parts |
|
|
1 | (24) |
|
|
|
|
|
|
|
|
|
A New Similarity Coefficient Based on Alternative Routes During Machine Failure |
|
|
25 | (30) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A Combinatorial Optimization Tour in Cell Formation via Hypergraphs |
|
|
55 | (46) |
|
|
|
|
|
Machine Cell and Part Family Formation in the Presence of Correlation Among Parts: A Mathematical Programming-Based Approach |
|
|
101 | (28) |
|
|
|
|
|
|
|
|
|
Flexibility Consideration in Designing Manufacturing Cells: A Case Study |
|
|
129 | (24) |
|
|
|
|
|
|
|
|
|
Group Scheduling for Cellular Manufacturing Systems |
|
|
153 | (56) |
|
|
|
|
|
A Comparative Study of Machine Cell Formation Algorithms for Non-Binary Matrices |
|
|
209 | (22) |
|
|
|
|
|
|
|
|
|
|
|
|
II ARTIFICIAL INTELLIGENCE, NEURAL NETWORKS, GENETIC ALGORITHMS AND COMPUTER TOOLS |
|
|
Solving Constraint Cell Formation Problems: A Neural Network Approach |
|
|
231 | (20) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Machine-Part Matrix Family Formation Implemented on a Parallel Neuro-Computer Utilizing an ART1 Neural Network |
|
|
251 | (34) |
|
|
|
|
|
|
|
|
|
|
|
|
|
A Heuristic Genetic Algorithm for Manufacturing Cell Formation |
|
|
285 | (26) |
|
|
|
|
|
|
|
|
|
Design of Material Handling System for Manufacturing Cell in an Agile Environment |
|
|
311 | (24) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Machine Cell Design Using Computer Simulation |
|
|
335 | (22) |
|
|
|
|
|
|
|
|
|
|
|
|
Index |
|
357 | |