Buy New
Rent Textbook
Rent Digital
Used Textbook
We're Sorry
Sold Out
How Marketplace Works:
- This item is offered by an independent seller and not shipped from our warehouse
- Item details like edition and cover design may differ from our description; see seller's comments before ordering.
- Sellers much confirm and ship within two business days; otherwise, the order will be cancelled and refunded.
- Marketplace purchases cannot be returned to eCampus.com. Contact the seller directly for inquiries; if no response within two days, contact customer service.
- Additional shipping costs apply to Marketplace purchases. Review shipping costs at checkout.
Summary
Table of Contents
Preface | p. IX |
Keynote lecture | |
Overview of Shanghai Yangtze River Tunnel Project | p. 3 |
Special lectures | |
Fire evacuation and rescue design of Shanghai Yangtze River Tunnel | p. 21 |
Shanghai Yangtze River Tunnel & Bridge Project management based on lifecycle | p. 27 |
Experiment and design | |
A review of shield tunnel lining design | p. 37 |
Analysis of the slurry infiltration effect on soil by true triaxial test under the ESEM-scanning | p. 43 |
Design and optimization of gasket for segment joint based on experiment and mathematical analysis | p. 53 |
Design of hazard prevention system for Shanghai Yangtze River Tunnel | p. 63 |
Design of shield work shaft constructed together with cut-and-cover tunnels | p. 69 |
Experimental study on fire damage to slab of exit flue of shield tunnel | p. 81 |
Integrated design and study of internal structure of Shanghai Yangtze River Tunnel | p. 85 |
Preliminary study of temperature rising and cooling measures for long road tunnel | p. 93 |
Research on fireproofing and spalling resistance experiment solution for reinforced concrete structure specimen of tunnel | p. 99 |
Study of full-scale horizontal integral ring test for super-large-diameter tunnel lining structure | p. 111 |
The application of single-fluid resisting shear type slurry with synchronized grouting system on large slurry shield machine in Shanghai Yangtze River Tunnel | p. 125 |
The dielectric constant testing of grouting slurry and soil behind shield tunnel segment in soft soil | p. 131 |
Construction technology and monitoring | |
70T hydraulic system truck | p. 141 |
Application of the large-scale integrated equipments in slurry treatment in shield tunneling | p. 145 |
Attitude surveying of the tunnel shield | p. 155 |
Construction logistics in large diameter and long distance shield tunneling | p. 159 |
Construction technology of shield inspection environment in Shanghai Yangtze River Tunnel | p. 167 |
Deformation monitoring system of circular tunnel cross section | p. 175 |
Driving the slurry TBMs for Shanghai Yangtze River Tunnel | p. 181 |
GFRP reinforcement cage erection technology in diaphragm wall | p. 193 |
Importing of shield machine of Shanghai Yangtze River Tunnel and Bridge | p. 199 |
Key techniques in cross passage construction of Shanghai Yangtze River Tunnel by artificial ground freezing method | p. 205 |
TBM options for Shanghai Yangtze River Tunnel Project | p. 211 |
The application of laser tracker in mould/segment measurement | p. 223 |
Theoretical analysis and numerical simulation | |
A 3D visualized life-cycle information system (3D-VLIS) for shield tunnel | p. 231 |
Analysis on influence of conicity of extra-large diameter mixed shield machine on surface settlement | p. 237 |
Numerical study on working ventilation of Shanghai Yangtze River Tunnel | p. 243 |
Optimization design and research of the cross section form and structure for Shanghai Yangtze River Tunnel | p. 247 |
Prediction for long-term settlement of Shanghai Yangtze River Tunnel | p. 253 |
Simplified analysis for tunnel seismic response in transverse direction | p. 259 |
Study on tunnel stability against uplift of super-large diameter shield tunneling | p. 267 |
Risk assessment and management | |
Construction risk control of cross passage by freezing method in Shanghai Yangtze River Tunnel | p. 277 |
Crack control measures during segment prefabrication of large diameter bored tunnel | p. 285 |
Dynamic risk management practice of construction for the long-distance and largest-diameter tunnel | p. 291 |
Prefabrication supervision of major tunnel lining with high precision | p. 299 |
Research on vibration monitoring and fault diagnosis for principal bearing in shield machine | p. 305 |
Risk analysis on shield tail seal brush replacing of Shanghai Yangtze River Tunnel | p. 311 |
Shanghai Yangtze River Tunnel split level evacuation provisions | p. 319 |
The construction management informationization practice in Shanghai Yangtze River Tunnel & Bridge Project | p. 325 |
The structural serviceability of large road tunnel | p. 333 |
Author index | p. 339 |
Table of Contents provided by Ingram. All Rights Reserved. |
An electronic version of this book is available through VitalSource.
This book is viewable on PC, Mac, iPhone, iPad, iPod Touch, and most smartphones.
By purchasing, you will be able to view this book online, as well as download it, for the chosen number of days.
Digital License
You are licensing a digital product for a set duration. Durations are set forth in the product description, with "Lifetime" typically meaning five (5) years of online access and permanent download to a supported device. All licenses are non-transferable.
More details can be found here.
A downloadable version of this book is available through the eCampus Reader or compatible Adobe readers.
Applications are available on iOS, Android, PC, Mac, and Windows Mobile platforms.
Please view the compatibility matrix prior to purchase.